Working with both jack-ups at the Cruise Jetty.
The jack-up barge in the background is piling the jetty for the cruise liners. The jack-up barge in the foreground is placing the 40 ton concrete beams for the top slab, where all the guests can disembark the liners and walk to shore. The dredger is seen in background and the sheet pile and anchoring works can be seen in the foreground.