onsdag den 27. februar 2008

Placing sheetpiles for harbour quay wall and building the core of the break water at Pointe Blanche


lørdag den 2. februar 2008

Emil visiting the workshop and the CAT 375


mandag den 14. januar 2008

Port Expansion St. Maarten Project

First works at the Cargo Harbour
First works at the Cruise Area
First works at the Breakwater



lørdag den 15. december 2007

St. Maarten Port Expansion Project

Photos of the Cruise and Main Contruction Sites



Photos of the Cargo Harbour Site, with the two Jack-up Barges.


The Workshop with site manager Tony van der Stelt and H. P. Jørgensen




mandag den 3. december 2007

The Da Fu of Panama (Big Lift) leaving Philipdburg, St. Maarten after delivering our two Jack-up barges Aarsleff III and Aarselff V.


lørdag den 1. december 2007

The Da Fu of Panama (Big Lift) arriving in Philipsburg, St. Maarten with our two Jack-up barges Aarsleff III and Aarselff V.

Da Fu is a Cosco owned skip, 153 m long and approx. 17.000 ton




The two Jack-up barges, Aarsleff III and Aarselff V, seen on deck of the Da Fu in Philipsburg, St. Maarten.

Cutting the sea-fastening



fredag den 30. november 2007

In November the main equipment including two jack-ups (Aarsleff III and Aarselff V), cranes, earthmoving- and piling- equipment, 288 pipe piles for the jetty, pipe piles and sheet piles for the 400 meter combi walls and sheet piles for some 215 meter retaining walls departed by special cargo vessel, the Da Fu of Panama (Big Lift), from Denmark and the Netherlands.